Scheduling Your Next Project

It’s Time to Line Up Your Spring & Summer Projects


NOW
is the time to start planning for upcoming 2018 construction projects, large or small.  Getting a head start saves money, reduces stress levels, and most importantly, ensures the end result will be more to your satisfaction.

By not rushing through the early stages of a project, there is more time to evaluate different options and avoid project delays, cost overruns, and frustration from all those involved.

Now Motivation Message

The Ideal Time to Get Started

This is the time of year where contractor’s work can slow down due to poor weather and the inability to do a lot outside.

This makes it the ideal time to plan your upcoming spring or summer project and to begin lining up contractors to do the work.

Planning your project early has a number of advantages:

  • Good planning makes for a good results.  “Winging it” at the last minute is never a pleasant experience and often results in mistakes and low satisfaction with the end results.
  • The local construction economy is very strong. The area’s best contractors are already booking well into spring and summer; some are even booking into fall!
  • For larger projects that require architectural plans and permitting, selecting a good General Contractor to help with the process is essential to success. This takes time.
    • Having some extra time allows you to consider different choices of contractors, not just having to take the first one that is available.
electrical meter on print

Work with a qualified contractor “early” for the best results.

  • Staying on budget is always a challenge with any project, so having time to evaluate alternative approaches can minimize cost overruns and schedule delays.
  • You will save money by getting bids now, rather than when everyone is booked solid during the height of the construction season – often as much as 25%.
  • Arranging dates and schedules early will give you the greatest flexibility and allow time for some contingencies to handle unforeseen problems and delays.
  • You gain the advantage of having time to plan and refine ideas.  Working on your spring and summer projects now allows all parties the necessary time to plan those essential details that turn a good project into a great project.

Artisan Electric logoContact Us With Your Questions
We’ll be happy to point you in the right direction to get your next project up and running … the sooner the better.

Contact us today at Artisan Electric or give us a call at 765-414-3913.

  1. No comments yet.
  1. No trackbacks yet.
You must be logged in to post a comment.